Intermediate Transom
Cuplock scaffold is a tubular system scaffold that uses the cup and blade locking mechanism for a fast, safe.
This consists of a horizontal steel tube with hooks which are designed to fit onto the horizontal standards of the scaffolding system.
The intermediate transom cuplock scaffold is installed between two horizontals at the mid-span of a bay to provide support for the planks in case there is a need to have a void at some point in the bay.
|
Code |
Description |
Material |
Finish |
|
CIT0914 |
Intermediate Transom 3’(914mm) |
48.3mmφ × 3.2mmT, Q235/Q355 |
H.D.G/Powder Coating |
|
CIT1219 |
Intermediate Transom 4’(1219mm) |
48.3mmφ × 3.2mmT, Q235/Q355 |
H.D.G/Powder Coating |
|
CIT2440 |
Intermediate Transom 8’(2440mm) |
48.3mmφ × 3.2mmT, Q235/Q355 |
H.D.G/Powder Coating |






Reviews
There are no reviews yet.